I have a tesla system 60 panels and two power walls. I have two more power walls to be installed on Jan 9th using the SGIP program. Before I dod my solar, I had to re roof my house and I needed to upgrade my electrical. I went with the SPAN panel and a SPAN drive. I also pre wired for a second...