Search results

  1. TyPope

    Nebraska

    I am still going to get one. 113344### but I haven't been asked to configure mine yet. Only having just over 200 shares means I'm out of the early group. So sad. I recently took a promotion that required a move so we are now Maryland residents. We didn't want to live anywhere near DC if...
  2. TyPope

    Nebraska

    Just a note to the Nebraska peeps out there: Well, here we are... a few years later... Still looking forward to my Cybertruck and still hoping to get mine before they are very common. It was neat being one of 3 Model Ys in our area. It'll be a much bigger deal with the Cybertruck. I can't...
  3. TyPope

    Tulsa TESLA

    Will the Semi be produced in it's own factory or share space with the CT and MY in the new factory?
  4. TyPope

    Iowa

    Well, that's not bad at all. I'd love to do panels on my house but got so irritated just trying to get a quote on a system that I all but gave up.
  5. TyPope

    Iowa

    That's quite the system... probably set you back a couple of bucks.
  6. TyPope

    Iowa

    The charger is built into every Tesla. The Wall connector is sold separately on Tesla.com. The High Power Wall Connector cost $500. It cost me, for instance, $1,200 to have a 100 Amp panel installed in the garage, two short 60 Amp runs (One for my CT and one for my wife's MY), a 20 Amp 110...
  7. TyPope

    Nebraska

    I definitely kept that in mind but I think most of his problems were in trying to adapt the Fremont plant to building 5 different cars. The rest of his projections seem to be much more on-target. The Shanghai factory is doing great. The German Gigafactory is also on target. I think he'll...
  8. TyPope

    Nebraska

    The shutdown and furlough will slow down production of the S3XY lines but shouldn't affect the CT timeline very much. When Elon announced the CT, they knew they'd have to build a factory first and I'm sure they figured the time to find land, improve it, build the factory, outfit it, and staff...
  9. TyPope

    Nebraska

    Factory installed would be bolted in appropriately, I'm sure. It'd have to be a Class-5 hitch to pull 14,000 I believe.
  10. TyPope

    Nebraska

    If you can load/unload 3,500 pounds into the bed of a pickup, more power to you. My 5,000 trailer with 9,000 pounds of furniture and stuff hardly put that much weight in the bed of the truck (it's a gooseneck trailer). A Ton of river rocks was about all I can get in my F-350 bed. I definitely...
  11. TyPope

    Nebraska

    Welcome to the Nebraska page.
  12. TyPope

    Nebraska

    LOL. I suppose our thought process on hitches is about to be altered.
  13. TyPope

    Nebraska

    3,500 tongue weight, I would assume as that's the load limit of the truck and also, they said it would pull 14,000 pounds. They have not mentioned gooseneck or 5th wheel compatibility.
  14. TyPope

    Nebraska

    LOL... Wrong state! Neat though.
  15. TyPope

    Nebraska

    I'm the one with the F350 Platinum.. Ruby Red with only 72k miles (it's for sale, btw). You may as well order one. It's $100 now and fully refundable.
  16. TyPope

    Nebraska

    Thank you. I'm excited too, of course... almost unbearably so. I've waited a long time to get a Tesla and the stars aligned right (proper planning and patience) so that we can get them both... mainly because it'll be a couple years before I get mine. I think the hardest part will be sitting...
  17. TyPope

    Nebraska

    I decided to just get the FSD upfront. I ALSO just did another thing... The Y is for my wife. I deleted the image with order info on it.
  18. TyPope

    Nebraska

    I know you are probably right that it makes financial sense to wait. I watched a guy who was driving a Tesla for the first time after getting his Model Y in the touchless delivery... Neat video Anyway, he tried out the Autopilot feature after saying several times "I like to drive. I want to...
  19. TyPope

    Nebraska

    Good point. If I pay for FSD the day after I take delivery, do I have to pay sales tax on that $7,000? That would save what? $490?
  20. TyPope

    Nebraska

    I put you on the sheet. I didn't know if you got the FSD option but I put it on the sheet as FSD. I can change it if you didn't order that. The sheet says you'll be # 104,995 and have to wait 11.39 months after production begins to get yours.


Top