greggertruck
Well-known member
- Thread starter
- #1
There appears to be second level loading docks being built at multiple areas of Giga Texas, but most notably accessing the "Cybertruck / Future Production" areas on the south side of the site. The dock on the north side appears permanent. Too early to say about the south platform access?
Are we starting to see some Cybertruck area developments?!