I tend to agree Morgan Stanley is shorting, so that’s the worst case scenario, but like Elon warned, could have production issues. On other hand, pre-building line at Fremont means production sooner. My question to all is when my 50k dual number comes up? Early to late ‘22 is my guess, maybe too...
Please never ever expect to go the full range of your battery. There needs to be some buffer above and below. As some are saying, range is your usage per mile x the watts remaining - a safe % at the bottom. I recently started part full with 205 miles of estimated range, drove 136 miles to the...
Most charging stations don’t work for trucks with trailers but some do already, for example: Seaside, OR has double pull thru charger sets, very doable if not full.
I already switched my early single res. to a dual. Instead of getting one of the earlier singles produced, I now expect to get one of the earlier duals. Suggest not waiting until the last minute. My dual is probably pushed to '22 because of all the Tri upgrades, guess I'll have to be ok with that.
I turned off the auto open on my S and easily double click the remote without removing it from pocket. Hangs from a belt clip and 3 or 4" lanyard. Do that.
Right now my meter is spinning backwards, selling solar to grid, but when dark, and needed by grid, could possibly sell some of my excess power wall or Tesla battery for that same or better price. If thousands of us are doing this very small amount, maybe no peaker plants are needed, and I make...