The authorized contractor is ready to install and has the equipment, but claims it won’t be operable until Tesla provides the software. So have to wait for that. Is that true?
Wise choice. I’ve had my CT since Feb 5th. Except for the famous accelerator issue which took a few minutes to take care of, I’ve had no issues! Rides beautifully and always look forward to getting behind the wheel. Enjoy.
I am planning to use my voucher for the power share equipment and install it for my home. But I understand that I then have to wait for a download but no firm indication when it's expected?
Can I assume that someone found it convenient to go to a DIY wash with the ole "wand" that sends a nice strong stream of soap and water that shouldn't harm the CT?
For me, there really is no loss of the "wow" factor with my AWD's acceleration. I've had it four months now and everyone I floored it with were blown away. But I have no intention to make this a habit as the acceleration is more than strong enough to give me everything I need. That is unless...
I was also interested in hearing if this might suggest that we are finally getting the replacement Aero cover soon for those of us that have had the FS.
I hope you’re right. In the meantime does it still make sense, if the capacity issue is true, to restrict non Tesla vehicles from using the Super Charging stations?
I’ve had my CT less than two weeks and its been charging up to 240 miles at 80% only so far. Not sure it could gain almost 100 more miles of range at 100%. Perhaps I’m missing something.