Sponsored

Atlanta Metro Deliveries

Woodrick

Well-known member
First Name
Ed
Joined
Dec 30, 2023
Threads
6
Messages
4,786
Reaction score
4,762
Location
Gainesville Ga
Vehicles
Model 3, Model Y, Cybertruck AWD
Occupation
Consultant
Country flag
There are 2 Beasts and 2 AWD sitting in the Duluth holding lot right now. Someone is going to be happy!
 

tretnga

Member
First Name
Tjay236
Joined
Mar 19, 2021
Threads
0
Messages
8
Reaction score
6
Location
Atlanta
Vehicles
Future cyber truck owner
Country flag
Finally!!! Delivery available. Wow long time coming.
configured on 3/4/24
Delivery scheduled for this week.
 

Maxt95

Active member
First Name
Max
Joined
Dec 26, 2023
Threads
0
Messages
28
Reaction score
23
Location
Georgia
Vehicles
Model S
Country flag
Anyone have a vin rn waiting to schedule delivery? Going on 10 days so far
 

tylerjohnson7

Active member
First Name
Tyler
Joined
Mar 26, 2024
Threads
1
Messages
27
Reaction score
36
Location
ATL
Vehicles
Tesla Model Y
Country flag
Anyone have a vin rn waiting to schedule delivery? Going on 10 days so far
I had to call to schedule. I am getting a low vin Friday at duluth. They swear that no customer has rejected but it is 08xxx
 


Maxt95

Active member
First Name
Max
Joined
Dec 26, 2023
Threads
0
Messages
28
Reaction score
23
Location
Georgia
Vehicles
Model S
Country flag
I had to call to schedule. I am getting a low vin Friday at duluth. They swear that no customer has rejected but it is 08xxx
I might have to do that then. Been sitting on 14 days now and I'm 06xxx too.
 

Woodrick

Well-known member
First Name
Ed
Joined
Dec 30, 2023
Threads
6
Messages
4,786
Reaction score
4,762
Location
Gainesville Ga
Vehicles
Model 3, Model Y, Cybertruck AWD
Occupation
Consultant
Country flag
Your trucks may be sitting in the overflow lot near the Duluth delivery center. It's not hard to find.
Some trucks have manufacture DATE on a large sticker on them, it has the day of month, unlike most everything else.

Both of these statements are more for the dual motor and not Beast.

An 8000 VIN is probably April or May. 8000 started at the first of April and at 1,000 per week, would take through next week if they keep the same rate up.

A 6000 VIN is probably March, pre-accelerator fix. But it easily can be any time, as Tesla is not completely sequential with VINs.

But pretty much for every negative that you can come up with your vehicle being built early or late, there's a flip side.

For example, my truck was built in March, but I didn't get it until late April:
Choose your statement
  • It was built while they were still closely monitoring the build quality and before they went into mass production!
  • It was built while they were still ramping up production and the probabilities of issues are much higher.

The reality?

You won't give a crap on delivery day!
 
 








Top