I was not trying to be critical but if you want to say order a replacement part pillar would not help. This is the look I was suggesting by extending the vinyl further out. But then you don't know if the truck is coming or going. Well I looked at the online parts catalog and they call it another...
The official name for those are cantrails. Not sure if I like it, add a bit of vinyl to the front so it's a smoother transition rather than a abrupt end. Tsportline does it to the rear to make a fake window.
DTE in Michigan has me at 13 cents from 11pm to 7am. This is on the dynamic peak pricing rate. My local supercharger low rate is 27 cents 12-4am and peak is 41 cents.
Got it, It looks like you had to mod the mirror socket the tesla ball mount snaps into. And there is not much room to feed the wires through the tesla mount. Did you have to drill bigger holes to fit the wires? What is the mirror brand and can it display 4k /2k images?
There are no connections on the mirror for power or video or GPS. I just installed the G900 Pro from wolfbox and all those connections are on the top center. Your mirror is void of any connections. What gives?
I was in the plant at the end of July and they had vin's in the 25,000 on the line. Mine is 17,000 ish built mid june. So they are averaging 200 a day x 6 day work week. I'd guess they are now around 34,000. I'll be back at the plant in 10 days or so and will check what they are up to.
I assume you are not changing the settings but try under settings/locks turn off 'Drive Door Unlock Mode' otherwise you'll have to hold down the driver door unlock button three seconds to unlock all other door locks including the vault controls. It's a safety thing.
The "unpainted metal" is metal that is ecoated in a greenish color after baking. The new process uses black ecoat so it appears painted but it's just a different color. The Cybertruck now has a dedicated PTED system. Previously before vin 23000 ish they were using the same process as the model Y...
650 at the most so for the headline 1000 sounds better. The current production rate of 1250 a week ramping to 2500 soon. That gives a daily rate of 250 to 500. That's a five day work week but they do work on Saturday sometimes. So having a day or two worth of production is hardly a big deal...
I'd put a double throw safety switch before the wall charger and the backfeed plug. That way you can select either or but not both. They sell cheap ones on amazon for $100 or an Eaton at Home Depot for a bit more...