They sure look like F-150s to me....
I think your wife already told everyone that....I'm going to remove the frunk tub, so when I open it, guys will be like "wow your engine is so tiny"
you know they have, right?Chill out reservation holders. Once Tesla starts hiring Cybertruck assembly line workers it’s time to get excited. I truly believe that mass production is still 3-6 months away.
If I recall they initially covered the GigaAustin Model Ys too. As more and more get built it will no longer make sense to cover all of them; and surely after the delivery event.PSA they’re covering them cause dirt I think. There’s no secrets. There isn’t anything “wacky” going on here with the exterior. It’s a painful process to clean the stainless I’d imagine. But maybe hiding interior stuff. Round wheel vs yoke. White interior vs black. 5 seat vs 6 (jk)
They’ve transferred existing Y assembly line workers over. They have team 1 built out.Chill out reservation holders. Once Tesla starts hiring Cybertruck assembly line workers it’s time to get excited. I truly believe that mass production is still 3-6 months away.
We saw more than 10 CTs go out this week. Let’s see how many go out every week. It will not always go up but over time it should and then we get a general idea of the ramp rate.They’ve transferred existing Y assembly line workers over. They have team 1 built out.
But yea, a ramp will be quite dictated by more hiring. I kinda don’t expect it though. They will instead transfer more Y workers and train up new Y line workers to replace them for a bit. We shall see!
I have a feeling they are fast tracking this south part of the extension for CT production.Chill out reservation holders. Once Tesla starts hiring Cybertruck assembly line workers it’s time to get excited. I truly believe that mass production is still 3-6 months away.
I don’t think it’s been realizing but the stamping machine that is going in the flattened dirty inside is on site already.I have a feeling they are fast tracking this south part of the extension for CT production.
![]()
That will be many months, maybe a year, so I hope that you are mistaken.I have a feeling they are fast tracking this south part of the extension for CT production.
![]()