Cyberbeast Trimotor VIN Assignment Tracking

TexasRaider

Well-known member
First Name
JR
Joined
Jan 10, 2023
Threads
33
Messages
920
Reaction score
833
Location
Denton
Vehicles
Cybertruck + MS
Occupation
Civil
Country flag
I also got the email on the 8th and submitted my order within five minutes. Nothing yet.

You guys are remembering incorrectly, it just said “early 2024”.

IMG_5903.jpeg
This is what I received also. “Early 2024.”
CB - Texas - 12/08
Sponsored

 

Lsanchez82

Well-known member
First Name
Luis
Joined
Dec 13, 2023
Threads
2
Messages
56
Reaction score
59
Location
San Diego, CA
Vehicles
Model 3, Model 3, Model Y
Occupation
Biotech
Country flag
Probably all Beasts were moved to Mid-Late 2024? I hope that is not the case and at least some who got that Early 2024, or the Jan-Mar 2024 that many people like me claim they saw are getting their Beasts really soon...
 

dantodd

Member
First Name
Dan
Joined
Jan 12, 2024
Threads
0
Messages
18
Reaction score
18
Location
SF Bay Area
Vehicles
M3, Sprinter, Miata, CT Founders Beast (ordered)
Country flag
Did they give you a reason as to why?
Most likely because the queue for AWD was quite long when he asked and they were not confident an AWD order placed at that time would be delivered before their place in the Beast queue.
 

RidnDirty

Well-known member
First Name
AJ
Joined
Jan 23, 2024
Threads
5
Messages
76
Reaction score
81
Location
Virginia
Vehicles
CB & M3
Country flag
CyberBeast Virginia:
> 11284xxx [ordered morning after show]
> 01/18/24 CB w/ Battery Pack ordered.
> accepted Tesla loan ~$46k deposit 6.59% 7-yr (no options on deposit and rate)
> power share documents email received & accepted.

no dates other then at the time of placing order it stated CT Feb-Mar and CB Late 2024.
hope that is helpfull
 

Woodrick

Well-known member
First Name
Ed
Joined
Dec 30, 2023
Threads
6
Messages
4,786
Reaction score
4,762
Location
Gainesville Ga
Vehicles
Model 3, Model Y, Cybertruck AWD
Occupation
Consultant
Country flag
Probably all Beasts were moved to Mid-Late 2024? I hope that is not the case and at least some who got that Early 2024, or the Jan-Mar 2024 that many people like me claim they saw are getting their Beasts really soon...
It appears that sometime the week or two before Christmas, the verbiage on the Cybertruck changed.
 


PerfectFlaw

Banned
Well-known member
Banned
First Name
K. P. G.
Joined
Jan 8, 2024
Threads
1
Messages
122
Reaction score
331
Location
OC, CA
Vehicles
Tesla
Country flag
Cyberbeast production for all CB orders was moved to "Mid to late 2024"

They wanted to deliver the slow and buggy versions out first so they can start manufacturing the real CTs, the beasts.
 

bmek

Member
First Name
Bryan
Joined
Dec 17, 2023
Threads
0
Messages
24
Reaction score
28
Location
California
Vehicles
Roadster 2.5 Sport, MY Dual, MY Perf, CyberBeast
Country flag
Cyberbeast production for all CB orders was moved to "Mid to late 2024"

They wanted to deliver the slow and buggy versions out first so they can start manufacturing the real CTs, the beasts.
Please state your source that "all CB orders was moved to "Mid to late 2024"".

I ordered a CyberBeast and haven't received any notification that my delivery window has changed.
 

Eagle4

Well-known member
First Name
Jay
Joined
Jan 3, 2024
Threads
1
Messages
46
Reaction score
36
Location
Huntsville AL
Vehicles
Red M3 white M3 grey MY
Occupation
MTM Assembly
Country flag
RN112746XXX configuration email received Order placed 0n 12 19 23.
Delivery January – March
also ordered range extender for delivery late 2024
PowerShare survey email received 12 22 23 and completed same day
acknowledged from Tesla update eligibility approved 01 29 24
no VIN as of 2 3 24


On a side note I "know, a guy" that works for a new car assembly plant, he experienced the beginning of a newly designed vehicle, starting with developing the production line and the start of building 6 cars a day. The ramp up is excruciatingly slow. I could bore you with so many details (that I Heard) regarding line changes, parts shorts and personnel turnover. From what this guy tells me the VIN assigned for the most part, when the car is ordered from the customer and the specific parts are ordered or allocated to that specific body number and VIN (thanks to Just In Time part scheduling). If Tesla works anything like that, we already have our VINs assigned in some computer in Texas, we likely just won't know until they start to build or ship. However, even then there are complications, if a part is defective and found during final inspection, I've heard it could take days or even weeks to repair because yes, even brand new cars rolling off the line have defects "I've heard". Additionally, rail seems to take longer to disperse then direct truck line to disperse then direct truck line or so I've heard.
 
Last edited:
OP
OP
Axtrader

Axtrader

Well-known member
First Name
Dan
Joined
Feb 22, 2020
Threads
3
Messages
52
Reaction score
93
Location
San Diego, CA
Vehicles
MX100D, MS100D, M3LR, MYP
Occupation
Shield AI Business Development
Country flag
My 12/8 Cyberbeast order stated Jan-Mar delivery and currently there is no indication from Tesla that the original window has moved to the right.
 

Woodrick

Well-known member
First Name
Ed
Joined
Dec 30, 2023
Threads
6
Messages
4,786
Reaction score
4,762
Location
Gainesville Ga
Vehicles
Model 3, Model Y, Cybertruck AWD
Occupation
Consultant
Country flag
From what this guy tells me the VIN assigned for the most part, when the car is ordered from the customer and the specific parts are ordered or allocated to that specific body number and VIN (thanks to Just In Time part scheduling). If Tesla works anything like that, we already have our VINs assigned in some computer in Texas, we likely just won't know until they start to build or ship.
This does not appear to be the way that Tesla allocates VINS. They seem to do it at the last minute possible. Part of this is probably because Tesla tends to build in batches. There's only a couple of different unpainted versions. And then there are only a few paint options. Lots less than most other manufacturers.
While the Cybertruck is different along these lines, batches end up being by color. So they make white ones for a week or two, then blue ones. This has been seen by seeing what the delivery dates are set for. And after the car comes off a line, then they have to fill a delivery vehicle for a specific location.
 

Bkb13

Well-known member
Joined
Jul 23, 2023
Threads
23
Messages
380
Reaction score
980
Location
Austin
Vehicles
raptor
Occupation
Entrepreneur
Country flag
This is why people think incorrectly that their date is from Dec-March. The attached was the complete ordering screen for the 12/8 invites. The first date presented to them was for the AWD, they didn’t pay attention to the updated date in the Cyberbeast section which says early 2024.