Yes I figured there would be brownfields on this project. I imagine they are fast-tracking this project by getting Foundation only permits while they finalize the structural, architectural and MEP designs that will be required to get the factory ready for Temporary Certificate Occupancy (TCO).Yeah, Musk had said they were limiting it to 'brown field' to limit the hurdles. The site they chose already had major permits and was massively disturbed earth. So much of the initial work could go ahead immediately before they needed some of the permits finalized.
-Crissa
Almost all of these big high-profile projects try for the TCO first, just like we did a few times in Vegas, while simultaneously working for the final Certificate Occupancy. That way, they can install the machinery and the assembly line equipment prior to the facility being 100% complete.
Sponsored
Last edited: