Throwcomputer
Well-known member
- Joined
- Jul 9, 2021
- Threads
- 26
- Messages
- 1,168
- Reaction score
- 2,960
- Location
- Staten Island, NY
- Vehicles
- 07 Ridgeline, Vintage Vespas, 02 Harley Sportster
- Occupation
- TV & Film
The 9k press would be necessary, if they decided to cast all "5" (or however many there actually are) separate cast parts at the same time in the same mold similar to how model kits cast multiple parts on sprues. This would be more efficient time using one giga press instead of multiple. Plus they could eventually figure out how to do as much of it all as one or two pieces and only have to swap out the mold to upgrade.He disagrees that the prototype is one big casting since he claims the gigapress is not up and running. Tesla will not be welding large castings together for the final version of the truck. If they were going to do that they wouldn't have needed the 9000 ton press. The 6000 ton press would easily handle each side of the truck alone.
Maybe that's also why they have so many cnc machines set up in the casting area.. Assembly line to cut the cast sections away from the sprues. Multiple cnc machines would mean high output enough to keep up with the giga press. One cutting while the other one is loading, and a third one for overflow or redundancy. All processing while the giga press is churning out sprues at a constant rapid rate.
Sponsored
Last edited: