I want my baby back baby back baby back ribs.Maybe. At this point I’d say 50/50 September/ October.
Hmm… smoking hot Cybertruck rear ends inbound in 3 months
only beef in Texas......hahahahaI want my baby back baby back baby back ribs.
Of course the original was upside down. It was designed by an Australian you insensitive clod.
Tesla's own presentation had the layout flipped lol, BUT I think we're all clear that "Future Production" area is for Cybertruck.
But will the 9kt gigapress end up in the "Casting" area, or the new "Cybertruck Production" area? Does the current Casting area even have enough room for that 9kt beast??
Plus, the CT castings would need to be hauled from the Casting area to the opposite corner of the factory, which is like 3 miles lol
But...this is Tesla's diagram, and corroborates what we saw during construction. You think Tesla is trying to trick us? lolI seriously doubt the actual layout looks much like this at all. Maybe it represents % of space used by specific things.
It is likely as accurate as you can get while rendering a 3d multi-floor building in 2 dimensions and attempting to preserve trade secrets.But...this is Tesla's diagram, and corroborates what we saw during construction. You think Tesla is trying to trick us? lol
Yeah, I wouldn't use it to measure for carpetsIt is likely as accurate as you can get while rendering a 3d multi-floor building in 2 dimensions and attempting to preserve trade secrets.
I would assume they would have it all done near by for logistics since they do have the room. Only time will tell.
Tesla's own presentation had the layout flipped lol, BUT I think we're all clear that "Future Production" area is for Cybertruck.
But will the 9kt gigapress end up in the "Casting" area, or the new "Cybertruck Production" area? Does the current Casting area even have enough room for that 9kt beast??
Plus, the CT castings would need to be hauled from the Casting area to the opposite corner of the factory, which is like 3 miles lol
Logistics already has the ingots, smelter, chimneys, fire suppression, bridge cranes all over in the NE corner.I would assume they would have it all done near by for logistics since they do have the room. Only time will tell.