mongo
Well-known member
- Joined
- May 27, 2024
- Threads
- 5
- Messages
- 4,527
- Reaction score
- 5,510
- Location
- SE Michigan
- Vehicles
- Cyberbeast
They are, I was trying to figure out how much "rework" was needed.I had a local neighborhood licensed electrician install my 2nd Gen 2 HPWC in my small garage for the CT, while I was still waiting on my Powershare Gateway to ship. It's a 75' run since my panels are in the main 2-car garage and the 1-car garage is on the other side of the house. To save on install, I had him run ~75' of #3 Al NM-B wire to a 60A disconnect right next to the HPWC and then ~4' of #4 Cu MC for the final leg since neither the Gen 2 HPWC nor the UWC is rated for Al conductors. My other Gen 2 HPWC is #6 THHN (#10 THHN ground) in 1" EMT that I installed myself. The installer that Qmerit connected me with said either was sufficient for the UWC install.
My install is full panel (one 200A out of the two I have) with Gateway outside, 50 feet underground (existing PVC) 100A run to new subpanel in detached garage, then EMT conduit overhead to the third bay. ~$6.5k.
Sponsored