- First Name
- Carl
- Joined
- Jan 19, 2020
- Threads
- 13
- Messages
- 121
- Reaction score
- 150
- Location
- Sacramento
- Vehicles
- Model S, Model X, Cyber Tri-Motor
- Banned
- #91
That's actually a worse situation than I thought - thanks for clarifying. Production problems on the premium vehicle and an overpriced base model... Hopefully they iron things out quickly.well, at least for now they’re not making so few beasts bc of low demand.
It’s bc it’s all they can build, due to driveline parts constraints (upside is it doesn’t hurt the halo of exclusivity around the truck)
demand-wise, check the orders thread for a rough proxy: 46 beasts to 61 AWD
What I was saying is that, given the build blend, the people ordering beasts will have a long wait.
so at the moment, they’ll be delivering 9 AWD for every 1 beast
Applying that to the order chart here, it means that all 61 AWD will be built and delivered before just 6 beasts will be built/delivered
or put another way, in the time those 46 beasts are built/delivered, they’ll have built/delivered 414 AWD trucks
at some point, the beast parts constraint will relax and I’d expect they play catch-up on beasts
that could be weeks, or months
but I expect more like months. And that this is why the Foundation order emails say deliveries for AWDF are between December and March, while deliveries for CBF are “in 2024”
Sponsored